Choosing the right automatic transfer switch (ATS) for a diesel generator starts with five checks: rated current, number of poles, switching mechanism, controller compatibility, and installation conditions.
The ATS must be able to carry the required load current, safely isolate the utility and generator supplies, and work correctly with the generator's automatic starting system. Selecting an ATS based only on the generator's kVA rating can lead to incorrect sizing or an unsuitable electrical arrangement.
For a three-phase generator, the starting point is:
Rated Current (A) = Generator kVA × 1,000 ÷ (√3 × Line Voltage)
For example, a 100kVA, 400V three-phase generator has a rated output current of approximately 144A. A 160A ATS may be a suitable starting point for evaluation, but the final selection must also account for the actual load, switching duty, environmental conditions, short-circuit requirements, and applicable electrical regulations.
At WALT POWER, we recommend confirming the ATS specifications together with the generator configuration rather than treating the transfer switch as a separate accessory.

The Primary Functions Of An ATS Include
An automatic transfer switch transfers an electrical load between two power sources, typically the utility supply and a standby diesel generator.
In a conventional standby power system, the operating sequence is:
- Utility monitoring: The ATS or associated controller monitors the normal power supply.
- Generator start request: When utility voltage or frequency falls outside the configured limits, the control system sends a start request to the generator.
- Generator availability check: The system waits for generator voltage and frequency to reach acceptable values.
- Load transfer: The ATS disconnects the normal supply and connects the generator supply.
- Utility restoration: When utility power returns and remains stable for the configured delay, the ATS transfers the load back.
- Generator cooldown: The generator runs unloaded for its configured cooldown period before stopping.
The exact sequence depends on the ATS controller, generator controller, programmed delays, and switching mechanism.
A conventional open-transition ATS does not provide zero-interruption power. There will normally be a power interruption while the generator starts, stabilizes, and accepts the load.
For equipment that cannot tolerate even a brief interruption, such as certain medical systems, data processing equipment, or critical control systems, a properly designed UPS or another suitable power-continuity solution may be necessary.
What Are The Benefits Of ATS On A Generator Installation?
An ATS is useful when a generator must supply power automatically without waiting for someone to operate a manual changeover switch.
Its main benefits include:
- Automatic backup operation: The system can start the generator and transfer the load after a utility failure.
- Controlled source switching: A correctly designed transfer system prevents the normal and standby sources from being connected together unintentionally.
- Reduced manual intervention: Operators do not need to be present for every power failure.
- Adjustable operating delays: Transfer, retransfer, and cooldown delays can be configured according to the system design.
- Improved operational consistency: The same switching sequence can be followed during repeated power interruptions.
However, an ATS does not automatically provide load prioritization, surge protection, or uninterrupted electricity. Those functions require additional equipment or specific system capabilities.
For commercial and industrial projects, the value of an ATS comes from its integration with the entire standby power system.
Why Is An Automatic Transfer Switch ATS Important?
The most important electrical safety function of a transfer switch is to prevent unintended connection between the utility supply and the generator supply.
Without an appropriately designed transfer arrangement, generator power could feed back into the utility network. This creates serious hazards for electrical workers and equipment.
A correctly selected ATS uses a switching mechanism with suitable interlocking and source-isolation arrangements. Depending on the design, these may include mechanical and electrical interlocks.
The ATS must also be coordinated with the installation's circuit protection, grounding and neutral arrangements, and applicable electrical codes.
For a permanently connected standby generator, a qualified electrician or electrical engineer should determine the appropriate transfer equipment and installation method.
How Does An Automatic Transfer Switch ATS Work?
The ATS and generator controller must work together, but the responsibility for detecting a power failure varies between system designs.
ATS With Built-In Utility Monitoring
Some ATS panels include their own utility voltage monitoring and control functions.
When the normal supply fails, the ATS controller sends a remote-start request to the generator controller.
Once the generator reaches acceptable voltage and frequency, the ATS transfers the load to the generator.
When utility power returns, the ATS follows the programmed retransfer sequence.
ATS Controlled By The Generator Controller
In other installations, the generator controller monitors utility power and manages the automatic starting sequence.
For example, a generator equipped with a compatible AMF controller may monitor the mains supply, start the engine, and command the transfer equipment.
The ATS then performs the physical switching operation.
Why Control Wiring Matters
An ATS installation usually requires more than the main power cables.
Depending on the control architecture, the system may need:
- Remote-start or stop signal wiring
- Utility voltage-sensing connections
- Generator voltage-sensing connections
- ATS position or auxiliary contact feedback
- Transfer and retransfer control signals
- Alarm or status communication wiring
Some integrated systems combine several functions within one controller, so the exact wiring arrangement varies.
Before purchasing an ATS, confirm the generator controller model and obtain the relevant wiring diagrams.
How To Size And Choose The Right ATS For Your Generator
I recommend checking the following five areas before confirming an ATS order.
Step 1: Calculate The Rated Current And Select The ATS Capacity
The ATS current rating must be appropriate for the electrical load it will carry.
For a three-phase system:
I = kVA × 1,000 / (√3 × V)
Where:
- I = line current in amperes
- kVA = apparent power
- V = three-phase line-to-line voltage
For a single-phase system:
I = kVA × 1,000 / V
The following table shows calculated three-phase generator currents at two common system voltages.
| Generator Capacity | Current at 400V, 3-Phase | Current at 480V, 3-Phase |
|---|---|---|
| 20kVA | 28.9A | 24.1A |
| 50kVA | 72.2A | 60.1A |
| 100kVA | 144.3A | 120.3A |
| 200kVA | 288.7A | 240.6A |
| 500kVA | 721.7A | 601.4A |
| 1000kVA | 1443.4A | 1202.8A |
These values represent calculated generator output current, not mandatory ATS sizes.
For example, a 100kVA, 400V generator produces approximately 144A at its rated apparent power. A 160A ATS could be considered if its ratings and operating conditions are suitable.
For another installation, the electrical design may call for a larger ATS because of continuous loading, temperature, switching duty, or future expansion.
A 125% sizing allowance is sometimes used in electrical design, but it should not be treated as a universal ATS selection rule. The applicable electrical code, actual load current, equipment ratings, and manufacturer instructions must determine the final capacity.
One point I always check: If the generator is rated 100kVA ESP but only 90kVA PRP, the buyer should clarify the intended operating duty. The generator's rating category and the electrical load profile are both relevant to the final system design.
Step 2: Choose A 3-Pole Or 4-Pole ATS
The difference between a 3-pole and a 4-pole ATS is whether the neutral conductor is switched.
| Item | 3-Pole ATS | 4-Pole ATS |
|---|---|---|
| Phase conductors | Switches three phases | Switches three phases |
| Neutral conductor | Normally remains connected | Switched with the phase conductors |
| Typical consideration | Systems designed with a solid neutral connection | Systems requiring neutral switching |
| Main engineering concern | Neutral and grounding coordination | Neutral switching sequence and grounding coordination |
A 3-pole ATS is not automatically the correct choice for every three-phase, four-wire installation.
Likewise, a 4-pole ATS is not always necessary simply because a generator has its own neutral connection.
The decision depends on the electrical distribution system, grounding and bonding arrangements, whether the generator is treated as a separately derived system under the applicable code, and the operation of residual-current or earth-fault protection.
Where neutral switching is required, the switching sequence and equipment design must also be appropriate.
For export projects, I recommend confirming the local installation requirements before deciding between 3P and 4P.
Step 3: Choose The ATS Switching Mechanism
Transfer switches use different switching technologies, including contactor-based, dedicated switch-based, and circuit-breaker-based arrangements.
Buyers may also encounter the classifications PC class and CB class under IEC 60947-6-1.
| Feature | PC Class ATS | CB Class ATS |
|---|---|---|
| Basic concept | Transfer switching equipment designed to make, carry, and withstand specified currents, including under defined short-circuit conditions | Transfer switching equipment incorporating overcurrent protective devices capable of interrupting short-circuit current |
| Overcurrent protection | Normally coordinated with separate protective devices | May incorporate circuit-breaker protection |
| Key selection checks | Rated current, utilization category, short-circuit withstand and coordination | Rated current, breaking capacity, protection settings and coordination |
| Suitable applications | Depends on the manufacturer's ratings and system design | Depends on the manufacturer's ratings and system design |
Neither class should be considered universally superior.
A PC class ATS is not automatically suitable for every high-current industrial application, and a CB class ATS is not automatically the better choice for every project.
The correct equipment depends on its certified ratings, short-circuit conditions, upstream protection, operating duty, and applicable standards.
For larger generator installations, the ATS should be reviewed as part of the overall low-voltage switchgear and protection system.
Step 4: Choose The Transfer Operating Mode
The most common standby generator arrangement uses open-transition transfer.
Open Transition (Break-Before-Make)
The ATS disconnects the first power source before connecting the second.
This prevents the two sources from being paralleled during the transfer operation.
It is widely used for conventional diesel generator standby systems.
Delayed Transition
A delayed-transition ATS introduces a controlled interval when the load is disconnected from both sources.
This can be useful for certain motor loads or systems where residual voltage and mechanical operation require consideration.
The delay must be selected according to the load characteristics and system design.
Closed Transition (Make-Before-Break)
Some specialized transfer systems can briefly connect two synchronized sources during transfer.
This requires suitable equipment, synchronization controls, protection, and utility approval where applicable.
It should not be confused with a standard open-transition ATS.
For most conventional standby diesel generator projects, open transition is the practical starting point. Other arrangements should be considered when the load or operational requirements justify them.
Step 5: Check The Enclosure And Controller Compatibility
The ATS must be suitable for its installation environment.
For indoor electrical rooms, the enclosure protection requirements may differ significantly from those for outdoor installations exposed to rain, dust, humidity, or salt-laden air.
Depending on the project, buyers may need to specify IP-rated enclosures, corrosion protection, ventilation, and suitable cable-entry arrangements.
The ATS must also be compatible with the generator controller.
For example, when a generator uses a Deep Sea or SmartGen controller, we need to verify the controller's available inputs, outputs, remote-start logic, and the ATS control scheme.
The controller brand alone does not guarantee compatibility. The specific controller model and wiring arrangement matter.
What Are The Advantages Of An Automatic Transfer Switch ATS?

The main advantage of an ATS is automatic operation during a utility failure.
However, proper installation requires both power connections and control integration.
A typical ATS installation includes:
- Normal utility power input
- Generator power input
- Load output
- Suitable protective devices
- Required control and sensing connections
- Grounding and neutral arrangements appropriate to the installation
The ATS must also have suitable mechanical and electrical interlocking so that an unintended connection between the two sources cannot occur.
For installations with large motors, elevators, compressors, or other demanding loads, the electrical engineer should check the load-transfer behavior and the generator's ability to accept the connected load.
An ATS cannot compensate for a generator that is undersized for the actual load.
Do Necessary Need An ATS For A Diesel Generator?
Not every diesel generator installation requires an automatic transfer switch.
The choice depends on how the generator will be used.
For example, a portable generator supplying equipment through suitable independent outlets may not require an ATS.
A standby generator connected to a building's electrical distribution system requires an appropriate means of safely transferring or isolating the power sources. Depending on the application and local regulations, this may be an ATS or an approved manual transfer arrangement.
An ATS is particularly useful when:
- The generator must start automatically during a power outage.
- The site is unattended for extended periods.
- Power failures occur frequently.
- Operators need a repeatable, controlled transfer sequence.
- The project requires automatic retransfer when utility power is restored.
For occasional manual backup applications, a properly designed manual transfer switch may be sufficient.
Is An ATS And AMF Similar In A Diesel Generator?
ATS and AMF are related, but they are not the same component.
ATS (Automatic Transfer Switch) refers to the equipment that physically transfers the load between power sources.
AMF (Automatic Mains Failure) refers to the control function that detects utility failure and manages the generator's automatic response.
An AMF controller can monitor utility power, request engine starting, check generator availability, and command the transfer equipment.
The ATS performs the actual power switching.

| Feature | ATS | AMF Controller | MTS |
|---|---|---|---|
| Main function | Transfers electrical load between sources | Monitors mains and manages automatic generator operation | Manually transfers electrical load |
| Physical power switching | Yes | Not by itself | Yes |
| Utility failure monitoring | Depends on the ATS design | Commonly included | Normally performed by operator or separate monitoring |
| Generator starting | May send a remote-start request | Can manage automatic starting when correctly configured | Normally requires separate manual or automatic starting |
| Operator required for each transfer | Normally no | Not applicable to the switching device itself | Yes |
In modern generator systems, the AMF function and ATS work together.
For example, a Deep Sea DSE7320-series controller can provide AMF-related functions when correctly configured, while the ATS handles the load transfer.
The exact arrangement must be checked against the controller model, ATS wiring diagram, and system requirements.
What Are The Ampere Ratings For ATS Used In Diesel Generators?
ATS equipment is available in a wide range of current ratings.
Common nominal ratings include 63A, 100A, 160A, 250A, 400A, 630A, 800A, 1000A, 1250A, 1600A, 2000A, 2500A, and 3200A, although available sizes depend on the manufacturer and switching technology.
WALT POWER supplies ATS solutions within the 63A–3200A range, subject to the selected configuration and project requirements.
The ATS capacity must be checked against the actual electrical system rather than selected from a generator power rating alone.
For larger generators or complex industrial installations, the project may require a customized switchgear and power-distribution arrangement instead of a standard standalone ATS panel.
How Far Can A Diesel Generator Be From The Automatic Transfer Switch ATS?
There is no universal requirement that a diesel generator must be installed 18–21 meters from its ATS.
The allowable distance depends on several engineering factors:
- Power cable size and conductor material
- Generator output current
- System voltage
- Cable routing and installation method
- Permissible voltage drop
- Short-circuit protection requirements
- Remote-start and control-signal wiring
- Environmental and maintenance access requirements
A longer cable run can increase voltage drop and installation cost. The cable size may need to be increased to maintain acceptable performance.
Control wiring must also be considered separately from the main power cables.
For long remote-start or monitoring circuits, the control voltage, cable characteristics, interference, and input requirements should be checked. Where necessary, suitable interface relays or alternative communication arrangements may be used.
I recommend deciding the generator location based on ventilation, exhaust discharge, noise, fuel-system safety, maintenance access, and the electrical design—not on an arbitrary fixed distance from the ATS.
Do Need To Turn Off The Main Breaker When Running A Diesel Generator On An Automatic Transfer Switch?
In a correctly designed and installed automatic transfer system, the ATS handles the transfer between utility and generator power according to its operating sequence.
The operator should not normally need to manually switch off the utility main breaker every time the standby generator starts.
However, this does not mean that the main breaker can be ignored during maintenance or that the ATS replaces all required protective and isolation devices.
Before maintenance, qualified personnel must follow the appropriate electrical isolation and lockout/tagout procedures.
If an installation does not have an ATS, a properly approved manual transfer arrangement may be used where permitted.
Simply switching off a main breaker and connecting a generator directly is not an acceptable substitute for a correctly designed transfer system.
What Is The Difference Between An ATS And An MTS?
An ATS transfers power automatically when the required conditions are met.
An MTS (Manual Transfer Switch) requires an operator to change the power source manually.
Both can provide source isolation when correctly designed and installed.
The main difference is the operating method.
An ATS is more suitable for unattended sites, frequent outages, and applications requiring automatic standby power.
An MTS may be suitable for installations where power failures are infrequent and manual operation is acceptable.
For an importer or project contractor, the decision should be based on the customer's operational requirements, not simply the purchase price of the switching equipment.
Common ATS Selection Mistakes I Recommend Avoiding
From a generator supplier's perspective, several issues are worth resolving before an order is confirmed.
Choosing The ATS Based Only On kVA
The same generator kVA rating produces different currents at different voltages.
A 100kVA generator at 400V has a different rated current from a 100kVA generator at 208V.
Always confirm the voltage and phase arrangement before selecting the ATS.
Ignoring Motor Starting And Load Characteristics
Compressors, pumps, and other motors may draw substantial starting current.
The generator must be capable of accepting the motor-starting load without unacceptable voltage or frequency deviations.
The ATS must also have suitable current and utilization ratings for the load it switches.
These are related but separate design checks.
Assuming Every ATS Can Start Every Generator
A generator controller must support the intended automatic-start arrangement.
Remote-start inputs, voltage monitoring, transfer commands, and auxiliary feedback should be checked against the actual wiring diagrams.
Overlooking Neutral And Grounding Requirements
Incorrect neutral switching or grounding arrangements can create protection problems and safety hazards.
The 3P/4P decision should be confirmed by the electrical designer responsible for the installation.
Treating An ATS As A UPS
A conventional standby ATS does not eliminate the interruption between utility failure and generator power availability.
Where uninterrupted power is essential, a UPS or another appropriate system must be included.
What Information Should Buyers Provide When Ordering An ATS?
For WALT POWER's overseas distributors, contractors, and project buyers, I recommend confirming the following information before requesting a quotation.
| Required Information | What We Need To Know |
|---|---|
| Generator capacity | Rated kVA or kW and operating duty |
| Voltage and frequency | For example, 400/230V 50Hz or 480/277V 60Hz |
| Phase configuration | Single-phase or three-phase |
| ATS current rating | Required amperage or the actual load schedule |
| Pole configuration | 2P, 3P, or 4P, as applicable |
| Generator controller | Brand and exact model |
| Installation environment | Indoor or outdoor, including enclosure requirements |
| Project requirements | Preferred switch brand, special protection, monitoring, or communication needs |
If the customer is unsure about the ATS current rating, we can review the generator specifications and the available load information before recommending a suitable configuration.
For industrial projects, the final electrical design and installation should be reviewed by qualified local professionals to ensure compliance with the applicable standards and regulations.
WALT POWER supplies diesel generator sets and matching ATS solutions for overseas B2B customers.
You can explore our diesel generator solutions or contact WALT POWER with your project requirements.
Conclusion
Choosing the right ATS for a diesel generator requires more than matching a switch to the generator's nameplate capacity.
The five most important checks are rated current, pole configuration, switching mechanism, controller compatibility, and installation requirements.
For a standard standby installation, a correctly sized open-transition ATS with suitable interlocking and compatible automatic-start controls is often a practical solution.
For more complex industrial applications, additional attention should be given to motor loads, short-circuit coordination, neutral and grounding arrangements, and the overall power-distribution design.
My recommendation is simple: confirm the generator and ATS specifications together before placing the order. It is easier to resolve compatibility questions during equipment selection than after the generator and switchgear arrive at the project site.